Bill No. |
Bill Date (DD/MM/YYYY |
Material |
Total Amount (In Rupees) |
Amount Paid (In Rupees) |
36 |
07/03/2021 |
0293-Stone Aggregate(single size): 40 mm nominal size |
605 |
605 |
36 |
07/03/2021 |
0367-Portland Cement |
304.8 |
304.8 |
36 |
07/03/2021 |
0982-Coarse sand (zone III) |
1216.8 |
1216.8 |
36 |
07/03/2021 |
3-Display Board |
100 |
100 |
36 |
07/03/2021 |
7318-Plasticizer / super plasticizer |
47.456 |
47.456 |
36 |
07/03/2021 |
MR9431-Broken stone aggregate 12 mm to 10 mm size |
764.82 |
764.82 |
36 |
07/03/2021 |
MR9432-Broken stone aggregate 20 mm size |
273.2 |
273.2 |
36 |
07/03/2021 |
MR9609-Add |
1.69 |
1.69 |
36 |
07/03/2021 |
MR9675-HOM of Vibrator 0.71 days |
1220.4 |
1220.4 |
36 |
07/03/2021 |
MR9678-Mixer (concrete) - 1 cum Capacity |
7.5 |
7.5 |
36 |
07/03/2021 |
MR9752-Add Handling , loading and unloading at 1% on Material |
355 |
355 |
36 |
07/03/2021 |
MR9757-Miscellaneous/Unforeseen charges which are necessary during execution. |
10 |
10 |
36 |
07/03/2021 |
MR9762-Add sundries charges at 1 % on Material |
10 |
10 |
36 |
07/03/2021 |
MR9773-Add watering charges at 1 % on Material |
375 |
375 |
36 |
07/03/2021 |
MR9862-RCC Cap 1000 mm dia, 100 mm thick |
508.35 |
508.35 |
36 |
07/03/2021 |
MR9867-Charcoal |
231 |
231 |
36 |
07/03/2021 |
MR9868-Aqua Nylon mesh |
242 |
242 |
36 |
07/03/2021 |
MR9961-Cost of 6.5mm M.S. Coil |
121 |
121 |
36 |
07/03/2021 |
MR9962-Fabrication charges. |
67.51 |
67.51 |
36 |
07/03/2021 |
MR9963-Transportation charges of materials beyond 5 KM @ 10% |
121.4 |
121.4 |
36 |
07/03/2021 |
MR9964-Labour charges for handing errection of RCC rings etc. @ 5% |
0.12 |
0.12 |
36 |
07/03/2021 |
MR9984-PVC pipe of 10kg\cum,90 mm |
0.5 |
0.5 |
|
|
Total Cash payment(In Rupees) |
6583.546 |
6583.546 |