Bill No. |
Bill Date (DD/MM/YYYY |
Material |
Total Amount (In Rupees) |
Amount Paid (In Rupees) |
73 |
20/01/2023 |
0002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper |
49.2512 |
49.2512 |
73 |
20/01/2023 |
0295-Stone Aggregate(single size):20 mm nominal size |
502.4948 |
502.4948 |
73 |
20/01/2023 |
0297-Stone Aggregate(single size): 10 mm nominal size |
358.287 |
358.287 |
73 |
20/01/2023 |
0298-Stone Aggregate(single size): 06 mm nominal size |
263.333 |
263.333 |
73 |
20/01/2023 |
0773-Unslaked lime |
181 |
181 |
73 |
20/01/2023 |
0851-water proofing cement paint |
416.1678 |
416.1678 |
73 |
20/01/2023 |
0982-Coarse sand (zone III) |
529.8717 |
529.8717 |
73 |
20/01/2023 |
0983-Fine sand (zone IV) |
272.5163 |
272.5163 |
73 |
20/01/2023 |
1007-Structural steel such as tees, angles, channels and R.S. joists |
5616 |
5616 |
73 |
20/01/2023 |
10-Miscellaneous /Contingencies charges |
236 |
236 |
73 |
20/01/2023 |
1198-Second class kail wood in planks |
172.644 |
172.644 |
73 |
20/01/2023 |
3-Display Board |
3000 |
3000 |
73 |
20/01/2023 |
7335-Binding wire |
38.9934 |
38.9934 |
73 |
20/01/2023 |
7-Worksite facilities/Creche/Drinking water/First aid |
938 |
938 |
73 |
20/01/2023 |
MR8001-Mason (special) |
3681.608 |
3681.608 |
73 |
20/01/2023 |
MR8002-Carpenter(special) |
1972.29 |
1972.29 |
73 |
20/01/2023 |
MR8003-Blacksmith(special) |
1305.792 |
1305.792 |
73 |
20/01/2023 |
MR8004-Painter/ Polisher(special) |
457.934 |
457.934 |
73 |
20/01/2023 |
MR8026-Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 % |
14254.24 |
14254.24 |
73 |
20/01/2023 |
MR8031-Granite stone of size not less than 0.0025 Cum. picked up. |
1150.9851 |
1150.9851 |
73 |
20/01/2023 |
MR8037-Granite Stone broken metal 40mm. Size (Hand broken) |
2021.0141 |
2021.0141 |
73 |
20/01/2023 |
MR8068-Non-sal bullahs 75mm. mean dia of any length. |
33.657 |
33.657 |
73 |
20/01/2023 |
MR8099-G.C.I. Sheet 0.30mm thick |
6571.8 |
6571.8 |
73 |
20/01/2023 |
MR8110-Cement |
19336.2 |
19336.2 |
73 |
20/01/2023 |
MR8111-HYSD bar (Reinforcement) |
4208.88 |
4208.88 |
73 |
20/01/2023 |
MR8186-GENERATOR 33KVA |
70.958 |
70.958 |
73 |
20/01/2023 |
MR8187-SCAFFOLDING CHARGES FOR BRICK MASONRY WORK |
365.64 |
365.64 |
73 |
20/01/2023 |
MR8190-CARRIAGE OF WOOD FOR CENTRING & SHUTTERING WORK |
2.07 |
2.07 |
|
|
Total Cash payment(In Rupees) |
68007.6274 |
68007.6274 |