Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Sep-2024 04:59:28 PM 
Material Back
State: KARNATAKA District: KOPPAL Block: KANAKAGIRI Panchayat: BASARIHAL

Expenditure on Material

[ Work Code- 1520001040/LD/93393042892275510]
Bill No. Bill Date
(DD/MM/YYYY
Material Total Amount
(In Rupees)
Amount Paid
(In Rupees)
21 01/07/2022 Centre GST 4628.82 4628.82
21 01/07/2022 MR9431-Broken stone aggregate 12 mm to 10 mm size 9420.64 9420.64
21 01/07/2022 MR9432-Broken stone aggregate 20 mm size 15900.24 15900.24
21 01/07/2022 MR9433-Broken stone aggregate 40 mm size 8287.68 8287.68
21 01/07/2022 MR9474-Granite/trap broken metal 100 mm and down size 43538.48 43538.48
21 01/07/2022 State GST 4628.82 4628.82
22 01/07/2022 0982-Coarse sand (zone III) 82417.92 82417.92
22 01/07/2022 Centre GST 5133.33 5133.33
22 01/07/2022 MR9424-Bond stone 20 x 20 x 45 cm 6237 6237
22 01/07/2022 MR9426-Boulders 1293.3398 1293.3398
22 01/07/2022 State GST 5133.33 5133.33
23 01/07/2022 Centre GST 4647.38 4647.38
23 01/07/2022 MR9535-Size stone 20 x 20 x 25 cms 77456.25 77456.25
23 01/07/2022 State GST 4647.38 4647.38
24 01/07/2022 0367-Portland Cement 64850.8 0
24 01/07/2022 7335-Binding wire 88.55 0
24 01/07/2022 Centre GST 4418.89 0
24 01/07/2022 MR9554-TMT bars Fe 500 8708.76 0
24 01/07/2022 State GST 4418.89 0
25 01/07/2022 0367-Portland Cement 64850.8 0
25 01/07/2022 7335-Binding wire 88.55 0
25 01/07/2022 Centre GST 4418.89 0
25 01/07/2022 MR9554-TMT bars Fe 500 8708.76 0
25 01/07/2022 State GST 4418.89 0
26 01/07/2022 MR9609-Add 3381.52 3381.52
26 01/07/2022 MR9735-Add Brush at 1% on cost of paint 180.92 180.92
26 01/07/2022 MR9753-Add Handling , loading and unloading at 2% on Material 420.33 420.33
26 01/07/2022 MR9757-Transportation/loading and unloading of material/lifting of material/centering charges wherever necessary /Over head/Wastage/Unforeseen charges/Miscellaneous which are necessary during execution. 60642.84 60642.84
26 01/07/2022 MR9759-Add providing and removing scaffolding at 3% on Labour 508.37 508.37
26 01/07/2022 MR9762-Add sundries charges at 1 % on Material 4211.96 4211.96
26 01/07/2022 MR9764-Add sundries charges at 2 % on Material 54.73 54.73
26 01/07/2022 MR9773-Add watering charges at 1 % on Material 3542.34 3542.34
26 01/07/2022 MR9801-The cost of all materials, centering, transportation, fixing, wastage and other extra charges etc, excluding the cost of Unskilled labour. 4058.78 4058.78
26 01/07/2022 MR9847-Welding Charges @ 10% on Material 6085.8 6085.8
26 01/07/2022 MR9858-Transportation loading and unloading @1% on material 55.77 55.77
26 01/07/2022 MR9859-Tools and Plants @2% on material 111.55 111.55
27 01/07/2022 0826-Aluminium paint 3163.0851 3163.0851
27 01/07/2022 7318-Plasticizer / super plasticizer 383.8004 383.8004
27 01/07/2022 Centre GST 4494.03 4494.03
27 01/07/2022 MR9444-Casurina poles 100 - 150 mm 324.6264 324.6264
27 01/07/2022 MR9534-Silver oak or equivalent planks 38 mm thick 190.6776 190.6776
27 01/07/2022 MR9675-HOM of Vibrator 0.71 days 25.35 25.35
27 01/07/2022 MR9677-Mixer (concrete small used in culvert) 483.84 483.84
27 01/07/2022 MR9678-Mixer (concrete) - 1 cum Capacity 3362.88 3362.88
27 01/07/2022 MR9690-Painter Class I 14390.238 14390.238
27 01/07/2022 MR9707-Wire mesh 50mm x 50mm 52576.08 52576.08
27 01/07/2022 State GST 4494.03 4494.03
28 01/07/2022 0828-Anticorrosive bituminous paint (black) 345.2424 345.2424
28 01/07/2022 MR9402-16 x 16 mm MS Square rod 2060.2725 2060.2725
28 01/07/2022 MR9407-36 mm x 6mm MS Plates 1830.939 1830.939
28 01/07/2022 MR9408-40 x 6 mm MS Plates 979.6083 979.6083
28 01/07/2022 MR9414-50 mm dia MS Hollow pipe B Class 14 Gauge 2061.9675 2061.9675
28 01/07/2022 MR9423-Ball bearing hinges heavy duty 920.6852 920.6852
Total Cash payment(In Rupees) 613684.6522 448712.8722

Download In Excel