Bill No. |
Bill Date (DD/MM/YYYY |
Material |
Total Amount (In Rupees) |
Amount Paid (In Rupees) |
01 |
24/01/2022 |
0002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper |
1625.2896 |
1625.2896 |
01 |
24/01/2022 |
0293-Stone Aggregate(single size): 40 mm nominal size |
2628.2784 |
2628.2784 |
01 |
24/01/2022 |
0295-Stone Aggregate(single size):20 mm nominal size |
15211 |
15211 |
01 |
24/01/2022 |
0297-Stone Aggregate(single size): 10 mm nominal size |
10718.4 |
10718.4 |
01 |
24/01/2022 |
0982-Coarse sand (zone III) |
1038.9296 |
1038.9296 |
01 |
24/01/2022 |
0983-Fine sand (zone IV) |
534.882 |
534.882 |
01 |
24/01/2022 |
10-Miscellaneous /Contingencies charges |
33 |
33 |
01 |
24/01/2022 |
1198-Second class kail wood in planks |
14592.4855 |
14592.4855 |
01 |
24/01/2022 |
2201-Bricks |
12161.639 |
12161.639 |
01 |
24/01/2022 |
2202-Stone aggregate below 40 mm nominal size |
26442.8424 |
26442.8424 |
01 |
24/01/2022 |
2203-Coarse sand |
11078.9086 |
11078.9086 |
01 |
24/01/2022 |
2205-Steel |
480.8019 |
480.8019 |
01 |
24/01/2022 |
2206-Stone aggregate 40 mm nominal size and above |
3891.2544 |
3891.2544 |
01 |
24/01/2022 |
2209-Cement |
2395.8947 |
2395.8947 |
01 |
24/01/2022 |
2335-Jamuna sand |
6310.4365 |
6310.4365 |
01 |
24/01/2022 |
7335-Binding wire |
1214.8461 |
1214.8461 |
01 |
24/01/2022 |
Labour Cess |
223 |
0 |
01 |
24/01/2022 |
MR8001-Mason (special) |
4154.06 |
4154.06 |
01 |
24/01/2022 |
MR8003-Blacksmith(special) |
3100.66 |
3100.66 |
01 |
24/01/2022 |
MR8026-Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 % |
40841.325 |
40841.325 |
01 |
24/01/2022 |
MR8060-Sal bullahs 75mm. to 120mm. mean dia up to 5.5m. long. |
5894.1496 |
5894.1496 |
01 |
24/01/2022 |
MR8068-Non-sal bullahs 75mm. mean dia of any length. |
364.6971 |
364.6971 |
01 |
24/01/2022 |
MR8070-Non-sal bullahs 125mm. mean dia of any length. |
283.8144 |
283.8144 |
01 |
24/01/2022 |
MR8186-GENERATOR 33KVA |
2218.481 |
2218.481 |
01 |
24/01/2022 |
MR8187-SCAFFOLDING CHARGES FOR BRICK MASONRY WORK |
731.94 |
731.94 |
01 |
24/01/2022 |
MR8190-CARRIAGE OF WOOD FOR CENTRING & SHUTTERING WORK |
179.055 |
179.055 |
02 |
24/01/2022 |
Labour Cess |
223 |
0 |
02 |
24/01/2022 |
MR8110-Cement |
77123.6505 |
77123.6505 |
03 |
24/01/2022 |
MR8111-HYSD bar (Reinforcement) |
157458.104 |
157458.104 |
|
|
Total Cash payment(In Rupees) |
403154.8253 |
402708.8253 |