Bill No. |
Bill Date (DD/MM/YYYY |
Material |
Total Amount (In Rupees) |
Amount Paid (In Rupees) |
11 |
20/01/2023 |
0002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper |
406.3224 |
406.3224 |
11 |
20/01/2023 |
0295-Stone Aggregate(single size):20 mm nominal size |
3640 |
3640 |
11 |
20/01/2023 |
0296-Stone Aggregate(single size): 12.5 mm nominal size |
377.4852 |
377.4852 |
11 |
20/01/2023 |
0297-Stone Aggregate(single size): 10 mm nominal size |
2603.5749 |
2603.5749 |
11 |
20/01/2023 |
0982-Coarse sand (zone III) |
171.9378 |
171.9378 |
11 |
20/01/2023 |
0983-Fine sand (zone IV) |
335.5938 |
335.5938 |
11 |
20/01/2023 |
1198-Second class kail wood in planks |
3120.1002 |
3120.1002 |
11 |
20/01/2023 |
2201-Bricks |
292.194 |
292.194 |
11 |
20/01/2023 |
2202-Stone aggregate below 40 mm nominal size |
4822.4329 |
4822.4329 |
11 |
20/01/2023 |
2203-Coarse sand |
997.1118 |
997.1118 |
11 |
20/01/2023 |
2205-Steel |
136.6512 |
136.6512 |
11 |
20/01/2023 |
2206-Stone aggregate 40 mm nominal size and above |
286.0092 |
286.0092 |
11 |
20/01/2023 |
2209-Cement |
619.8108 |
619.8108 |
11 |
20/01/2023 |
2335-Jamuna sand |
1860.9561 |
1860.9561 |
11 |
20/01/2023 |
3-Display Board |
2500 |
2500 |
11 |
20/01/2023 |
6-Labour welfare fund/Cess |
1450 |
1450 |
11 |
20/01/2023 |
7335-Binding wire |
289.089 |
289.089 |
11 |
20/01/2023 |
MR8026-Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 % |
1057.8505 |
1057.8505 |
11 |
20/01/2023 |
MR8068-Non-sal bullahs 75mm. mean dia of any length. |
363.6479 |
363.6479 |
11 |
20/01/2023 |
MR8110-Cement |
13155.654 |
13155.654 |
11 |
20/01/2023 |
MR8111-HYSD bar (Reinforcement) |
25677.555 |
25677.555 |
11 |
20/01/2023 |
MR8186-GENERATOR 33KVA |
563.49 |
563.49 |
11 |
20/01/2023 |
MR8190-CARRIAGE OF WOOD FOR CENTRING & SHUTTERING WORK |
23.805 |
23.805 |
|
|
Total Cash payment(In Rupees) |
64751.2717 |
64751.2717 |