S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Const of Revtment and stud on left side slice 2 harsabela (2608001003/FP/9989038761) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.57 |
0 |
0 |
35.54 |
0 |
39.11 |
2.58244 |
0 |
0 |
0 |
0 |
2.58244 |
2 |
Const of revetment on left side slice 1 in harsabela (2608001003/FP/9989038765) |
On Going |
W.R Deptt. |
Flood Control and Protection |
4.16 |
0 |
0 |
35.07 |
0 |
39.23 |
2.55024 |
0 |
0 |
0 |
0 |
2.55024 |
3 |
Estimate for construction of revetment and stud on left side in village Harshabela (2608001003/FP/9989038771) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.82 |
0 |
0 |
35.07 |
0 |
38.89 |
1.23873 |
0 |
0 |
0 |
0 |
1.23873 |
4 |
ESTIMATE FOR CON OF REVENTEMENT AND STUD ON LEFT OF SATLUJ RIVER VILL HARSABELA (2608001003/FP/9989038773) |
On Going |
W.R Deptt. |
Flood Control and Protection |
5.17 |
0 |
0 |
33.58 |
0 |
38.75 |
4.96588 |
0 |
0 |
0 |
0 |
4.96588 |
5 |
estimate of construction of revetment on left side of Satluj river at Vill Harsabela (2608001003/FP/9989038775) |
On Going |
W.R Deptt. |
Flood Control and Protection |
5.17 |
0 |
0 |
33.58 |
0 |
38.75 |
4.45841 |
0 |
0 |
0 |
0 |
4.45841 |
6 |
Constt of Revetment and stud on Right side slice 3 harsabela (2608001003/FP/9989038777) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.57 |
0 |
0 |
35.54 |
0 |
39.11 |
0.23152 |
0 |
0 |
0 |
0 |
0.23152 |
7 |
CONSTRUCTION OF REVETMENT AND STUD ON LEFT SIDE STLUJ RIVER AT VILL HARSHABELA (2608001003/FP/9989038778) |
On Going |
W.R Deptt. |
Flood Control and Protection |
5.17 |
0 |
0 |
33.58 |
0 |
38.75 |
1.00174 |
0 |
0 |
0 |
0 |
1.00174 |
8 |
Estimate for construction of revetment and stud on Lside of satluj to save abaddi vill harsabela (2608001003/FP/9989038779) |
On Going |
W.R Deptt. |
Flood Control and Protection |
5.17 |
0 |
0 |
33.58 |
0 |
38.75 |
5.04413 |
0 |
0 |
0 |
0 |
5.04413 |
9 |
Constt of Revetment and stud on Right side slice 4 harsabela (2608001003/FP/9989038781) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.57 |
0 |
0 |
35.54 |
0 |
39.11 |
0.57896 |
0 |
0 |
0 |
0 |
0.57896 |
10 |
Constt of Revetment and stud on Right side slice 6 harsabela (2608001003/FP/9989038787) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.57 |
0 |
0 |
35.54 |
0 |
39.11 |
0.74543 |
0 |
0 |
0 |
0 |
0.74543 |
11 |
CONSTRUCTION OF REVETEMENT OF STUD ON LEFT NO 8 SIDE ABADIES VILL HARSHA BELA (2608001003/FP/9989038789) |
On Going |
W.R Deptt. |
Flood Control and Protection |
4.17 |
0 |
0 |
35.06 |
0 |
39.23 |
0.40089 |
0 |
0 |
0 |
0 |
0.40089 |
12 |
Estimate for construction of revetment on Lside of satluj river silce 10 to save abadies vill haresa (2608001003/FP/9989038793) |
On Going |
W.R Deptt. |
Flood Control and Protection |
4.16 |
0 |
0 |
35.07 |
0 |
39.23 |
2.76791 |
0 |
0 |
0 |
0 |
2.76791 |
13 |
CONSTRUCTION OF REVETEMENT OF STUD ON LEFT SIDE ABADIES SLICE 11 VILL HARSHA BELA (2608001003/FP/9989038794) |
On Going |
W.R Deptt. |
Flood Control and Protection |
4.16 |
0 |
0 |
35.07 |
0 |
39.23 |
0.50747 |
0 |
0 |
0 |
0 |
0.50747 |
14 |
CONSTRUCTION OF REVETEMENT OF STUD ON LEFT SIDE ABADIES SLICE 12 VILL HARSHA BELA (2608001003/FP/9989038797) |
On Going |
W.R Deptt. |
Flood Control and Protection |
4.17 |
0 |
0 |
35.06 |
0 |
39.23 |
3.6547 |
0 |
0 |
0 |
0 |
3.6547 |
15 |
CONSTRUCTION OF REVETEMENT OF STUD ON LEFT SIDE ABADIES SLICE 13 VILL HARSHA BELA (2608001003/FP/9989038799) |
On Going |
W.R Deptt. |
Flood Control and Protection |
4.17 |
0 |
0 |
35.06 |
0 |
39.23 |
2.89703 |
0 |
0 |
0 |
0 |
2.89703 |
16 |
CONSTRUCTION OF REVETEMENT OF STUD ON RIGHT SIDE SLICE 08 ABADIES VILL HARSHA BELA (2608001003/FP/9989038801) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.89 |
0 |
0 |
35.53 |
0 |
39.42 |
0.8636 |
0 |
0 |
0 |
0 |
0.8636 |
17 |
CONSTRUCTION OF REVETEMENT OF STUD ON RIGHT SIDE ABADIES SLICE 9 VILL HARSHA BELA (2608001003/FP/9989038803) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.89 |
0 |
0 |
35.53 |
0 |
39.42 |
0.78182 |
0 |
0 |
0 |
0 |
0.78182 |
18 |
Estimate for construction of revetment on Rside of satluj river silce 10 to save abadies vill haresa (2608001003/FP/9989038805) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.89 |
0 |
0 |
35.53 |
0 |
39.42 |
0.53227 |
0 |
0 |
0 |
0 |
0.53227 |
19 |
Estimate for construction of revetment on Rside of satluj river silce 11 to save abadies vill haresa (2608001003/FP/9989038807) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.89 |
0 |
0 |
35.53 |
0 |
39.42 |
0.81852 |
0 |
0 |
0 |
0 |
0.81852 |
20 |
CONSTRUCTION OF REVETEMENT F STUD ON RIGHT SIDE SLICE 12ABADIES VILL HARSHA BELA (2608001003/FP/9989038808) |
On Going |
W.R Deptt. |
Flood Control and Protection |
3.89 |
0 |
0 |
35.53 |
0 |
39.42 |
0.78471 |
0 |
0 |
0 |
0 |
0.78471 |
21 |
STRENGTHING EMBANKMENT ALONG SATLUJ UNDER NREGA HARSABELA (2608001003/FP/9989037965) |
On Going |
W.R Deptt. |
Flood Control and Protection |
5.68 |
0.3 |
0 |
0 |
0 |
5.98 |
2.97849 |
0.07638 |
0 |
0 |
0 |
3.05487 |
22 |
Const of Revtment and stud on left side slice 1 harsabela (2608001003/FP/9989038759) |
On Going |
R.D.Deptt. |
Flood Control and Protection |
3.57 |
0 |
0 |
35.54 |
0 |
39.11 |
1.2822 |
0 |
0 |
0 |
0 |
1.2822 |
|
Grand Total |
|
|
|
92.47 |
0.3 |
0 |
735.13 |
0 |
827.9 |
41.67 |
0.08 |
0 |
0 |
0 |
41.74 |